What is your lead time for installations?

With each site being subject to different planning regulations, the time needed for obtaining permission to install a swimpond can differ across locations.

If you don’t live in a listed building or within a conservation area, planning consent isn’t needed and we can go straight from surveying and drawing to costing and then directly onto your installation without any planning delays.

As a rule, the lead time on booking a survey is around 2 weeks. Once the site visit and survey information has been collected by your consultant, the drawings and 3D renders of your design can be completed in 3-5 weeks by our design team at head office.

If you have a clear design brief and budget we can usually present a design concept that doesn’t need too many amendments.

We have an average lead time of 4-5 months. This is from the date of engaging with us on a design plan to when we break ground.

For clients being the design process in the Autumn, their project can be complete in the Spring and ready to enjoy the following summer.